Send Message
Home ProductsHybrid Stepper Motor

120V Three Phase Hybrid Stepper Motor For Industrial Machine

I'm Online Chat Now

120V Three Phase Hybrid Stepper Motor For Industrial Machine

120V Three Phase Hybrid Stepper Motor For Industrial Machine
120V Three Phase Hybrid Stepper Motor For Industrial Machine

Large Image :  120V Three Phase Hybrid Stepper Motor For Industrial Machine

Product Details:
Place of Origin: China
Payment & Shipping Terms:
Minimum Order Quantity: Negotiable
Price: Negotiable
Payment Terms: T/T
Supply Ability: 10000 piece/pieces per month

120V Three Phase Hybrid Stepper Motor For Industrial Machine

Description
Power: 1000KW Current / Phase: 6.0A
Nominal Voltage: 120V Apply To The Machine: Stepper Motor
Dielectric Strength: 1000V AC 50Hz 2mA 1Minute Usage: Industrial
Application: Precision Equipment
High Light:

50Hz Hybrid Stepper Motor

,

Three Phase Hybrid Stepper Motor

,

120V Stepper Motor

Three Phase Hybrid Step Motor For Industrial Machine

 

Hybrid rotor: This kind of rotor has a specific construction, and is a hybrid between permanent magnet and variable reluctance versions. The rotor has two caps with alternating teeth, and is magnetized axially. This configuration allows the motor to have the advantages of both the permanent magnet and variable reluctance versions, specifically high resolution, speed, and torque. This higher performance requires a more complex construction, and therefore a higher cost. Figure 3 shows a simplified example of the structure of this motor. When coil A is energized, a tooth of the N-magnetized cap aligns with the S-magnetized tooth of the stator. At the same time, due to the rotor structure, the S-magnetized tooth aligns with the N-magnetized tooth of the stator. Real motors have a more complex structure, with a higher number of teeth than the one shown in the picture, though the working principle of the stepper motor is the same. The high number of teeth allows the motor to achieve a small step size, down to 0.9°.

 

Electrical Specifications
  • Product certification : CE
  • Nominal voltage : 120V
  • Power : 1000KW
  • Apply to the machine : Stepper Motor
  • Suitable range : Welding equipment, dispensing equipment, painting equipment, fetching equipment, feeding equipment, cutting equipment, machine tool equipment
  • Type:Straight axis & Axis of a cone
Step Angle
0.6°/1.2°
Insulation Resistance
500V DC 100MΩ Min
Dielectric Strength
1000V AC 50Hz 2mA 1Minute
Ambient Temperature
-20~+40℃
Temperature Rise
80℃ Max
Insulation Class
B

 

 

Features :

  1. Brushed permanent magnet DC motor

  2. Variable speed and reversible

  3. Planetary Gear Box

 

1. Using Enameled Copper Wire, Not Enamelled Aluminium Wire, So the motor is a more reliable and long lifetime.
2. Low noise, Long lifetime.
3. More stable and safer when driving.

 

Company Introduction 
Changzhou paliwei Motor Co., Ltd was a high technology industry zone in Changzhou, China. Our products are used in many kinds of machines, such as 3d printers CNC machines, medical equipment, weaving printing equipment, and so on.

 

The company spirit of sincere and good reputation, won the recognition and support of the broad masses of customers, at the same time with the domestic and foreign suppliers' close community of interests, the company entered the stage of benign development, laying a solid foundation for the strategic goal of realizing only really the sustainable development of the company.

 

Q: How to order?
A: send us an inquiry → receive our quotation → negotiate details → confirm the sample → sign contract/deposit → mass production →cargo ready → balance/delivery → further cooperation

 

Q: How about a Sample order?
A: A sample is available for you. please contact us for details. Once we charge you sample fee, please feel easy, it would be refund
when you place formal order.

 

Q: Which shipping way is available?
A: DHL, UPS, FedEx, TNT, EMS, China Post, Sea are available. The other shipping ways are also available, please contact us if you
need ship by the other shipping way.

 

Q: How long is the delivery [Producing] and shipping?
A: Deliver time depends on the quantity you order. usually, it takes 15-25 working days.

 

Q: My package has missing products. What can I do?
A: Please contact our support team and we will confirm your order with the package contents. We apologize for any inconvenience.

 

Q: How to confirm the payment?
A: We accept payment by T/T, PayPal, the other payment ways also could be accepted, Please contact us before you pay by the other payment ways. Also 30-50% deposit is available, the balance money should be paid before shipping.

 
 

Contact Details
Changzhou Prevail Motors and  Electrical Equipment Co., Ltd

Contact Person: Mr. Wang

Tel: 13961468369

Send your inquiry directly to us (0 / 3000)